Services
Natural Gas, Petroleum Facilities and Pipelines
Project Summary (Return)
Project Type: Petroleum
Fort Lee Petroleum Training Facility (PTF) |
| Date Delivered: April 2000 |
| RK&K completed the engineering, design, drafting and construction management for a piping refit solution. Engineering services involved replacing 12,000 feet of three-loop, six-inch aluminum facility piping to reduce system leakage. Engineering design included developing hydraulic model using Flo-Series, pipeline stress simulation analyses with ALGOR PipePlus, and construction specifications and management. Project also included revising facility pump-orders and assisting with facility testing. |

